At the end of each item the DSR rate is shown, so that it is easy to compare both the rates. DSR rate in 'Green' means it is tallied with Analysed rate. Where sub analysis is involved the analysed rate will not tally exactly to that of DAR because, in DAR every rate is rounded-off. But in this analysis, I have not rounded-off to nearest 5 np. But both the rates are very close.

Author: | Grokora Juhn |
Country: | Honduras |
Language: | English (Spanish) |
Genre: | Literature |
Published (Last): | 11 November 2007 |
Pages: | 180 |
PDF File Size: | 19.54 Mb |
ePub File Size: | 5.32 Mb |
ISBN: | 933-9-59674-238-2 |
Downloads: | 99332 |
Price: | Free* [*Free Regsitration Required] |
Uploader: | Zolorisar |
At the end of each item the DSR rate is shown, so that it is easy to compare both the rates. DSR rate in 'Green' means it is tallied with Analysed rate. Where sub analysis is involved the analysed rate will not tally exactly to that of DAR because, in DAR every rate is rounded-off. But in this analysis, I have not rounded-off to nearest 5 np. But both the rates are very close.
Where ever there is an error in DAR only a few items this time it is mentioned in the item it self. Please let me know, if I am violating any copy right, so that I can delete the post from internet.
If any one want to share some thing about this analysis with me, they are welcome! Please do mail me on rambabujalli gmail. Even a small comment will boost my enthusiasm to work more. X Code. Description Sub Analysis - X Details of cost for 1 cum of lime Flyash mortar lime:2 flyash:3 coarse sand.
Beldar Bhishti Running and upkeep of mortar mile Sundries. Item Code : 3. Item Code : Fitter grade 1. Item Code : P Cost materials in sub-analysis of Sheet 1. Structural steel such as tees, angles channels and R.
Sub Analysis - Y Details of cost for 1 cum. X Sub-Analysis - X For item Description Part-1 Cost of materials : Assuming that pavement 30m long Hence form work to be provided for 2 days. Material for Steel Assuming that labour for steel shuttering shall be required as compared to timber shuttering.
Contact area of 50 slabs of steel shuttering. Description 0. Details of Cost for : 1. Assuming that the timber will become unserviceable after being used 8 times Planks 38 mm Seconti class kail wood Inside: 25x1. Item Code : Y Sub-analysis item for fabication charges in item no. Plants and Labour required for sub anlaysis Item Code : S Cost of material for using once in item code X sub analysis for Details of Cost for : All kinds of soil Code Add C.
Item Code: 2. All kinds of soils Code Code Amount 1. Day 0. Amount All kinds of soil. Mate Coolie. Ordinary rok Code Hard rock requiring blasting Details of Cost for : Hard rock blasting prohibited Details of Cost for : Description Slope assumed 1 in Earth work and fillingMinimum depth of trench 60cm. All kinds of Cum soil. Item Code: Excavating trenches for pipes, cables, etc - All kinds of soil - Pipes, cables etc, exceeding 80 mm dia upto mm.
Slope assumed 1 in Earth work and fillingMinimum depth of trench 0. Ordinary rok Refilling, ramming and watering Filling available excavated earth excluding rock.. Say mm. Slope assumed 1 in ExcavationMinimum depth of trench.
ExcavationMinimum depth of trench 0. Slope assumed 1 in ExcavationQuantity same as in item No. Hard rock Details of cost for 30 m length of a pipe of an average dia. Hard rock blasting prohibited Refilling, ramming and watering Balli struts: 3. Carpenter llnd class Beldar Sundries. Carpenter Ilnd class Beldar Sundries.
Details of Cost for : 6. Poling boards of 2nd class Kail wood planks: 6. Balli struts 3. Details of cost for a manhole 1. Poling boards of 2nd class Kail wood planks cum x38mm : 45x0. Raking struts 3. Poling board of Second class kail wood in planks 1. Struts of Safeda ballies mm diameter 2x17x1. Poling board : 1. Poling board of Second class kail wood in planks mm wide and 38mm thick 6x0. Qty taken for cost of using once after deducting credit 86x0. Second class kail wood in scantling Walling mmxm : 4x1.
Safeda ballies mm diameter 4x1. Poling board : 0. Qty taken for cost of using once after deducting credit 6. Poling board of Second class kail wood in planks mm wide and 38mm thick 40x1. Safeda ballies mm diameter 40x1. Second class kail wood in planks mm wide and 38mm thick 40x1. Walling mmxmm : Second class kail wood in scantling cum 4x30mx0.
Struts of Safeda ballies mm diameter metre 2x17x1. All kinds of Cum 3. Description Details of cost for 10 holes Earth work 10 x 0. Hard rock Cum 3. Description Details of cost of tree of 15cm. Labour for cutting in trees removing the roots from the soil and then filling in Pit and depresions. Beldar Coolie Sundries.
Description Details of cost of a tree- of av. Description Details of cost for a tree- avg. Labour for cutting the trees and removing in roots from the soil filling in pit and the depresions Beldar Coolie Sundries. Description Unit Quantity Details of cost for a tree of average girth cm, average dia 1. Carraige of Solvent Chlorpyriphos. Details of Cost for : 9.
JBL SRX712M PDF
Cpwd Dar 2012 in Ms Excel

This page uses Javascript. Your browser either doesn't support Javascript or you have it turned off. To see this page as it is meant to appear please use a Javascript enabled browser. CPWD for its effective working has developed the following codes, manuals, schedules, technical specifications, design manuals and other necessary technical publications.
HP ENVY 700 075D PDF
CPWD ENGINEERS ASSOCIATION-Blog

Aug Bookmark the permalink. Aw, this was an extremely good post. Like Like.
DS2480B PDF

.
LM309 DATASHEET PDF

.